GT-RE-03
GT-RE-03 trains the higher technician who can operate an architecture combining photovoltaics, battery, grid, generator, loads and supervision. The module links energy to automation and data, and prepares learners for advanced maintenance and hybrid-site operation. Official fault count: 30 injectable scenarios. Any « 40 » on the visual is a caption error; GT-RE-04 remains at 40. Included training: 5 days — 35 hours. Audience: BTS/DUT, maintenance, design offices. Distinct from GT-RE-LAB-001.
Characteristics
- Level 3 — Supervise and diagnose — Supervised hybrid system
- Audience: BTS/DUT, maintenance, design offices
- Included training: 5 days — 35 hours (targeted theory, demonstrations, practicals, diagnosis, practical assessment)
- Purpose: analyse, communicate, diagnose and restore service
- Skills: energy priorities, curves and alarms, power quality, technical report
- Situations: hybrid grid/battery/generator/loads, network analyser, RS485, Modbus RTU/TCP, Ethernet, supervision
- Faults: minimum 30 injectable scenarios (official value). Any « 40 » on the visual is a caption error; 40 is reserved for GT-RE-04
- Architecture: PV + grid + battery + generator + loads
- Pedagogical PV: 3–5 kW; battery: 5–10 kWh; hybrid inverter: 5–10 kVA
- Grid: 230/400 V; pedagogical generator: 3–5 kVA
- Single- and three-phase loads; energy meter; network analyser; complete AC/DC protection
- Communication: RS485, Modbus RTU/TCP, Ethernet, Wi-Fi, PC/tablet monitoring, energy supervision
- Minimum 30 injectable fault scenarios (official). « 40 » on the visual is a caption error; GT-RE-04 remains at 40
- GT-RE modular solar range: one platform, four mastery levels
- Skills path: observe → wire → measure → parameterise → diagnose → optimise → validate
- Each level can be ordered separately or as the full 18-day / 126-hour path
- Deliverables: manuals, trainer guide, learner booklets, practicals, grids, diagrams, fault matrix, animations, digital media
- Proposed organisation: on-site, French, 8 to 12 participants; 20 % input, 65 % practicals, 15 % assessment
- Commercial visuals are non-contractual; technical envelopes freeze at customer configuration
- Warranty and service: commercial proposal; definitive terms in the offer and acceptance report
- Distinct from integrated laboratory GT-RE-LAB-001; internal GT-RE-BASE is not sold alone
GENIE TECHNICS GT-RE-03

