⌖ Ajman Media City, United Arab Emirates✉ contact@genietechnics.ae
Product sheet

Digital operations and maintenance platform — GT-OPS-01

Reference : GT-OPS-01

GT-OPS-01 — Digital operations and maintenance platform — GT-OPS-01

GT-OPS-01

GT-OPS-01 is the operations and maintenance block of the nine-module GENIE TECHNICS renewable-energy programme. It centralises data, alarms, history, spares, work orders and indicators from the GT-RE, GT-HYD, GT-WIND, GT-GRID and GT-PROD blocks. Outside the 336-hour core path (trainer-of-trainers / O&M option). Full local operation without Internet. A single O&M station, without the power circuits of the other benches.

Characteristics

  • GENIE TECHNICS renewable-energy programme, nine modules: internal GT-RE-BASE (not sold alone) and eight sellable blocks
  • Solar foundation: GT-RE-01 operator 21 h · GT-RE-02 installer 35 h · GT-RE-03 hybrid technician 35 h · GT-RE-04 microgrid expert 35 h
  • Extension: GT-HYD-01 hydro 70 h · GT-GRID-01 grid 70 h · GT-PROD-01 productive uses 70 h · GT-OPS-01 operations and maintenance
  • GT-WIND-01: commercial complement attached to GT-HYD-01 (hydro / electromechanics); 70 h training; outside the core path
  • Core path (RE-01 to 04 + HYD + GRID + PROD, excluding trainer-of-trainers option): 336 h
  • Skill chain: generate → convert → store → distribute → supervise → maintain → productive uses
  • Ordered alone or as the full path; learners configure, measure, inject a fault, diagnose and restore service
  • Groups of 8 to 12; 20 % input, 65 % practicals, 15 % assessment
  • Operations and maintenance block of the EnR programme — O&M supervision of the other sellable blocks
  • Mobile operator station: work surface, industrial display 24 inch minimum, industrial PC, managed switch
  • RS485 / Modbus RTU and Modbus TCP gateways ; interfaces to meters, inverters, BMS, protection, PLCs, sensors
  • Backup UPS and controlled removable local backup
  • Real-time synoptics, states, alarms, history, curves and reports
  • Indicators: availability, energy, efficiency, losses, incidents, MTBF, MTTR, economic service delivered
  • Work orders, maintenance routines, critical spares, stock thresholds, serial-number traceability
  • CSV and PDF export, time-stamped journal, configuration backup and restore
  • Full local operation without Internet ; optional deferred synchronisation
  • Roles, initial-credential change, network segmentation, action logging
  • Collection via Modbus RTU/TCP from meters, inverters, BMS, protection and PLCs
  • Dashboards by site, asset and service ; ranked alarms with traced acknowledgement
  • Exercises: remote diagnosis, trending, preventive maintenance, restore, incident, intervention report
  • No solar panel, reservoir, turbine or cold chamber built into the furniture
  • Pedagogical envelopes declared by GENIE TECHNICS. Exact ratings freeze at customer configuration. No invented part numbers. Commercial visuals are non-contractual. Distinct from integrated laboratory GT-RE-LAB-001.

GENIE TECHNICS GT-OPS-01